We replaced the teak on the first 6 meters and replaced caulking on the entire deck. We installed new cap rails and fitted new teak on lockers in the cockpit. The teak corners of the roof section were replaced.

New installations in the front section, new drinking water system, new deck wash system, new water maker, new hydraulics. We stripped down all fittings on the mast and fitted them back after the mast was spray painted. We rebuilt and installed the bow thruster.