Carbon instruments, antennas and radar arch. Engineering, building and installing. We also took care of interior carpentry, checked the teak deck and placed new deck hardware. All glass and seals in hatches were replaced. We took out the windows of the doghouse, polished it and reinstalled the windows. The bow thruster room was redesigned.